Public Projects
Sort by
Date Posted
Bids Due in 22 days
12/12/24 2:00pm
Electronic bidding
Camp Arroyo Swimming Pool Replaster
Bids Due in 22 days
East Bay Regional Park District
EBRPD
Swimming pool replaster, including new tile, coping stones and recirculating fittings, replacement of skimmers and auto fill, pool stair replacement and minor equipment room improvements.
Bidding Closed
7/11/24 2:00pm
San Francisco Bay Trail at Point Molate, Richmond, CA
Bidding Closed
East Bay Regional Park District
Point Molate, Richmond, CA
Grading/earthwork; construction of 2.3-mile segment of San Francisco Bay Trail, construction of shoreline revetment, beach access trail, and installation of two prefabricated wooden boardwalk structures.
Bidding Closed
6/5/24 2:00pm
Improve Peralta Oaks North Project
Bidding Closed
East Bay Regional Park District
EBRPD
Remodel an existing 4-level office building consisting of four levels of office/administration and parking. The existing building is owned by the District and the renovation will create a new state of the art LEED Gold certified facility serving the District’s various emergency operations and life safety operations. The total square footage (SF) of the existing building and renovation is 99,170 SF.
Bidding Closed
1/23/24 2:00pm
Job Order Contract “License A”: JOC-037, JOC-038
Bidding Closed
EBRPD
Oakland, CA
A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor may perform an ongoing series of individual Projects at different locations throughout the District. The bid documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor, material and equipment prices and are for the direct cost of construction.
Bidding Closed
11/30/23 2:00pm
Prequalification: Improve Peralta Oaks North Project (IPON)
Bidding Closed
East Bay Regional Park District
2955 Peralta Oaks Court Oakland, CA 94605
Remodel an existing 4-level office building consisting of one level of parking and three levels of office/administration. The existing building is owned by the East Bay Regional Parks District and the renovation will create a new state of the art facility serving the District’s various emergency operations and life safety operations. The total square footage (SF) of the existing building and renovation is 99,170 SF